Our 4-Point Pre-Submission Protocol
To prevent municipal rejection notes and avoid costly project delays, our in-house Quality Assurance department audits every engineering deliverable before filing with authorities:
Forensic Load & Phase Balance Audit
Verifying calculated connected load against building intake breaker ratings with balanced single-phase spread.
Physical Site & Riser Verification
Confirming that actual cable tray pathways, riser conduit dimensions, and meter niche spaces match CAD schematics.
Mandatory 1000V Megger Insulation Testing
Measuring resistance across all phases and neutral before scheduling DEWA low-voltage site inspections.
10-Bar Hydrostatic Gauge Hold
Subjecting all potable water pipelines to 10-bar pressure hold for 24 hours prior to wall and ceiling closure.